TECHBLOG

A Heaven For Aspiring Technocrates


2011
August 30
Robotics Technical SupportDate of posting:19 August
Eligibility: BE/B.Tech
MBA/PGDM(Operations Management)
Location: Chennai
Job Category: IT/Software
Last Date: 4 September 11

Job Type: Full Time
Hiring Process: Face to Face Interview.
Job Details

logo

Qualification : Any Graduate

Skills Required :

  • Sound knowledge of Electronics.
  • Good Organizational Skills.
  • Ability to work in a team and meet deadlines.

Note : Only Chennai Local candidates are peferred.

 

2011
August 30
ProgrammerDate of posting:26 August
Eligibility: BE/B.Tech(Computer Science Engineering, Information Science/Technology, Communication & Computer Engineering)
MCA
Location: Chandigarh
Job Category: IT/Software
Last Date: 31 August 11

Job Type: Full Time
Hiring Process: Written-test.
Job Details

Job Description:

  • PHP, Mysql developer required having experience of OOPS, atleast one major CMS.
  • Experience in phpframework will be a plus.
  • At least six months of experience required.

Qualification: MCA, B-tech-computer science/IT from 2008/09/10 batches.

Note: Recruitments through Freshersworld.com only. This is NOT a direct walk-in.

 

 

2011
August 30
Off-Campus RecruitmentDate of posting:9 August
Eligibility: BCA
BE/B.Tech
BSc
MCA
ME/M.Tech
Diploma
Location: Any where in India
Job Category: BSc/BCA/BCM, Diploma, IT/Software
Last Date: 4 September 11

Job Type: Full Time
Hiring Process: Written-test.
Job Details

Eligibility Criteria :

  • Students from 2011 BE/ B.Tech/ ME/ M.Tech/ MCA (Computer Science, Electronics, Electrical, IT, IS)/ B.Sc (Computer Science, Mathematics, Electronics, Statistics, IT)/ BCA/ Diploma batches.
  • Candidates should have maintained 65% in 10th, 12th, Degree and Post graduation (if applicable) with no standing arrears or backlogs.
How to apply

Registration is open only for candidates who have graduated in 2011.

Click Here to Apply Online

 

2011
July 20

Well you all know that Google Plus is increasing user with Massive speed and due to many cool features it seems that It will give tough fight to Facebook. The same thing happen in India when ORKUT was on peak andFacebook grab the market. I guess Orkut is still in Tier II cities of India but after Google Plus this will be changed.

Well back to the point, you all want to switch to Google Plus with major data from Facebook. So you love to get your Photos on Google Plus.

2011
July 20

On 18th of July, Google has updated once again the PageRank Toolbar values. We remind you that the previous update took place only 3 weeks ago, on 27th of June. From what we see, several websites were affected by this new update and many webmasters started to complain that their PageRank values dropped by 1 or 2 points.

2011
July 20

If you are not aware of Google+ is starting to become a big deal… If you haven’t heard please go back to using MySpace and Yahoo Chat rooms…

You may also informed  that Facebook is shutting down extensions and apps that allowed you to pull your friend list from Facebook and import your contacts into Google+. Where from there you could invite them and/or add them to a Circle.

Well there is still 1 way to do this that hasn’t been blocked by Facebook.. YET!!!

2011
July 17

Most of the companies and clients are trying to get themselves engaged in various social media channels for various purposes or marketing and products and services promotions.

2011
July 10

By a combination of both JavaScript on the client end and ASP.NET controls at server end, A developer can embed a lot of functionality into AJAX-based Web pages.

A developer who is familiar with server-side programming methods will find adding AJAX capabilities quite easy, especially using a graphical IDE such as Visual Studio 2008. To give a simple example, in Visual Studio 2008 a partial update function can be added to existing server-side code by applying a wrapper for the UpdatePanel (allows the server control to update without a postback operation). A simple drag-and-drop is all that is required to add this capability, eliminating the need for hand coding.

From the client side, a developer who understands basic JavaScript can add AJAX client-side code easily.

Creating an ASP.NET 3.5 AJAX project using Visual Studio 2008 is relatively easy. From the Visual Studio 2008 menu, select File > new Web Site, and then select the ASP.NET Web Site option to create the browser-side code:

Ajax New Site

Visual Studio 2008 then opens a new page with a skeleton in your preferred language (Visual Basic or Visual C#):

Ajax code

 

Now you can now either code manually, or drag and drop control like buttons, images, and others to the page, and Visual Studio 2008 will populate the code for you. While simple sites that use AJAX can be completed with none or a minimal amount of coding, as you would expect more complex sites require a mix of the use of the Visual Studio 2008 controls and hand coding to accomplish the desired goal. The process, though, is much easier than earlier approaches where every line of code was manually created and maintained in text editors.

2011
June 29

1. If it is not documented, it doesn’t exist. As long as information is retained in someone’s head, it is vulnerable to loss. - Louis Fried, 1992

It says that Information only counts when it is properly documented. Be it a Project Scope document, Quotation of Services, Project Estimation Document or any other document, Project manager needs to be sure that there is proper standard documents for respective team members.

2. Why do so many professionals say they are project managing, when what they are actually doing is fire fighting? - Colin Bentley, 1997

Being a project manager means having a clear and well thought out plan and calmly leading your team to a successful conclusion while repelling anyone intent on upsetting your plans.

2011
June 15

Many complex, long-term projects fail to live up to their promises and produce disappointing outcomes on completion. Some of these are well-known for exceeding their budgets or deadlines or both.

Not all projects are such high profile ones, but there are plenty that exceed their budgets or fail to deliver on their promises just as spectacularly. Project managers often have a poor reputation for delivering what was expected without budget or time over-runs. And one of the industries with the worst record is the technology industry where failures are said to exceed 50% of all projects undertaken.

project failure

So organisations make commitments to major projects, but cannot always deliver what was expected and, more worryingly, cannot determine how much value they are getting from their investment. Many corporations do not even measure the value added by a project once it has been completed.

Publicly available statistics of project failures vary dramatically in their estimates and do not include confidential data from private corporations so are not an entirely reliable guide. Yet each new project begins with enthusiasm and no expectation of failure, but often without having learned lessons from previous projects that might contribute to success this time around.

Even on simple, straightforward projects there are many areas that can cause the sorts of problems that can eventually manifest themselves in failure. Add to the many possible causes of failure any level of complexity and problems can rapidly escalate into disasters. Here are just some of the most common causes of project failure:

  • Poorly defined project scope.
  • Inadequate risk management.
  • Failure to identify key assumptions.
  • Project managers who lack experience and training.
  • Improper tuning within the team.
  • No use of formal methods and strategies.
  • Lack of effective communication at all levels.
  • Key staff leaving the project and/or company.
  • Poor management of expectations.
  • Ineffective leadership.
  • Lack of detailed documentation.
  • Failure to track requirements.
  • Failure to track progress.
  • Lack of detail in the project plans.
  • Lack of feedback at each phase.
  • Inaccurate time and effort estimates.
  • Cultural differences in global projects.

 

So the causes of project failure are wide and varied. In addition promised resources may not be available when required, executives may fail to grasp the full reasons behind instigating a project or there may be political reasons for continuing with a clearly unviable project.

But how can lessons be learnt from previous project failures?

There are three potential causes of project failure that are the most important of all and, if dealt with fully and completely, can help to avoid project failure. These are

 

  • The Project Scope
  • Risks Assumptions
  • Key Assumptions

 

Also important is retaining the skills already available within an organisation and developing existing and new talent through project management training. Professional project management courses in internationally recognised methodologies such as PMP can assist organisations in developing and retaining talented project managers.

 

Page 1 of 3123
MAIL US for your queries!!!!

Interested in working with us?

This is the only Blog which provides you technology updates and details on ASP.Net, AJAX, JQuery & Javascript at one place. And we would keep on expanding this tech-blog with more upcoming platforms and sections.